Stabilisation de la plateforme et du talus en bord de lagune
Development of the Jubail Island (Abu Dhabi)
Soil improvement and land leveling to homogenize the platform level at 2.5m above the highest sea level
Grain Storage Facilities – Port Saïd (Egypt)
Soil improvement approach in a subsoil characterized by an upper layer of loose sand exposed to liquefaction risks
Michelin & Foton Showrooms (Dora)
Very loose silty sand alluvial soil with a water
table almost leveled at the surface – Soil improvement and rigid Inclusions with a transfer layer of compacted fill
Quaywall for the Main Canal (EKO Atlantic – Nigeria)
Concept and preliminary design of a Quaywall to be executed on both sides of the canal
Private villas along a laguna (Abidjan)
Concept and Execution Design of a Slope Protection along the Laguna (inclined slope with a double layer of Rip Rap protections)
Container Terminal, Quay 16 of Beirut Port
Design of the embedded pipe networks under the heavy loaded platform, analysis of the soil structure interaction, and evaluation of the pipe ovalization
Al-Raha Beach (Abu-Dhabi)
Technical control and approval for the execution design of a 20 km cantilever Diaphragm Quay Wall developed by Soletanche-Bachy
Safina Drydocks (Dubai)
Technical control and approval of the execution design developed by Soletanche-Bachy
Contained Quay (Kuwait)
Conceptual and preliminary study for Contained Quay, with a 17 m water depth, capable of receiving 4th generation cargos
Urban excavation for SOLETANCHE-BACHY – FONTEC (BELGIUM)
82cm D-Wall executed with strutting system
Hotel Niger (Guinee)
Soil Improvement – Rigid Inclusion Solution in critical soil conditions
VASSILIKOS LPG PLANT (CYPRUS)
Study of the behavior of the backfilled soil under the loads
coming from the LPG vessels
LPG II – spheres (Port Sudan)
Behavior and sizing of the piles under the loads coming from the spherical LPG tanks
Sama (Beirut)
D-Wall supported by prestressed anchors for the highest tower ever executed in Lebanon
Tayouneh Mall (Beirut)
D-Wall supported by prestressed anchors
Town Quay Marina (Beirut)
D-Wall executed using the Top/Down technique – first deep excavation project on the site of the Normandy fill
BLOM Bank Headquarters (Beirut)
D-Wall executed using the Top-Down technique in very complex conditions next to the sea
BLF Bank Headquarters (Beirut)
Soil Investigation with geophysical study – Geotechnical Consultancy – Design of tension piles
Crystal Towers (Antelias)
Deep Foundations and Stone Columns – Geotechnical Consultancy, in collaboration with TERRASOL FRANCE
Business Building (Demo)
Lorem ipsum dolor sit amet, consectetur adipisicing elit.
Business Building (Demo)
Lorem ipsum dolor sit amet, consectetur adipisicing elit.
Pellentesque accumsan (Demo)
Lorem ipsum dolor sit amet, consectetur adipisicing elit.
Pellentesque accumsan (Demo)
Lorem ipsum dolor sit amet, consectetur adipisicing elit.
Quisque bibendum (Demo)
Lorem ipsum dolor sit amet, consectetur adipisicing elit.
Quisque bibendum (Demo)
Lorem ipsum dolor sit amet, consectetur adipisicing elit.
UNIGAZ Spheres (Dora)
Studies for the foundations of two spherical reservoirs planned for the storage of liquefied gas, LPG
Plaza Tower (Antelias)
D-Wall executed using the Top/Down technique in very bad soil next to a river
Mercedes Showroom (Beirut)
Lorem ipsum dolor sit amet, consectetur adipisicing elit.
Waste Public landfill (Oued Smar – Algeria)
Rehabilitation of a domestic waste landfill to create and develop a public garden with a specific landscaping and
limited loading
Palm Island II (Dubai)
Technical control of the D-Wall works of the main channel (90 000 m2 of cantilever D-Wall verified under seismic conditions) with control of the soil improvement works
executed using the vibro-flotation technique
Le Mall (Dbayeh)
Lorem ipsum dolor sit amet, consectetur adipisicing elit.
Hotel Construction (Demo)
Lorem ipsum dolor sit amet, consectetur adipisicing elit.
Hotel Construction (Demo)
Lorem ipsum dolor sit amet, consectetur adipisicing elit.
Town Quay Marina (Beirut)
D-Wall executed using the Top/Down technique – first deep excavation project on the site of the Normandy fill
Centro Hotel (Damascus)
Lorem ipsum dolor sit amet, consectetur adipisicing elit.