D-Wall executed using the Top/Down technique – first deep excavation project on the site of the Normandy fill
Deep Foundations and Stone Columns – Geotechnical Consultancy, in collaboration with TERRASOL FRANCE
Soil Investigation with geophysical study – Geotechnical Consultancy – Design of tension piles